Week 1, 5/12 Thursday

Today I finished up labeling the rest of the plans. I then did dimensions of all the toilet and urinal stalls for the same area. Then I got taught how to do a door schedule by reading it in the construction documents then creating it in CAD. This was very different than doing furniture or finish schedules like we’ve done on our projects before. It included size, material, frame material, hardware, door elevation and such things. This was neat because it was something I had never done before and I didn’t know that much was involved.